Friends who still don’t know how to make the pipes of the Happy Factory vertical. Now let the editor of Source Code Network introduce to you how to vertically introduce the happiness factory pipeline.
Turn on the construction mode of the pipeline and click the R button to cycle Xie Huan to switch to the vertical construction mode.
In this mode, the pipeline can be straightened directly, making it easier to arrange the pipeline placement route.
A pipeline pump should be installed at a low position in the pipeline to better allow the pipeline to reach the highest flow rate.
Depending on the height of the pipeline, multiple pipeline pumps may need to be placed at some locations for lifting.