I believe that many players are still not clear about this. So today I will let the editor of Sourcecode.com bring you the complete details of "Hammer". I hope it will be helpful to you.
1. First unscrew the lower screws
2. After the screws leave the board, click on the green hole above
3. Move the screw to the green hole to successfully pass the level.
1. Start from the bottom first and move all the screws at the bottom to the holes at the top.
2. Then move the two screws on the right side into the cavity at the top so that the last row of metal plates falls down, and then remove the third row of screws on the right side.
3. After the lower right corner and the lower row of iron pieces fall off, move the third row of screws to the holes below.
4. Release the iron piece in the lower left corner, and then move the screws in the fourth row downwards
5. Fill the lower two rows of screws in turn, and then move the fourth row of screws downwards.
6. Follow the above steps to move all the horizontal iron pieces and remove all the square iron pieces.
7. Finally remove the vertical iron piece and keep moving the screws to the right
8. After moving the last vertical row of screws, you can successfully pass the level.
1. The third hole in the upper right corner is locked, and there are only five holes to move other screws.
2. First move all the screws in the bottom row to the top, and then move the screws in the second to last row to the bottom.
3. First remove the two horizontal rows of iron bars, and then move the screws in the third row from the bottom down in sequence.
4. Move all the screws in the fourth row from the bottom down and let the largest iron piece in the middle fall down.
5. Then clear out the four vertical holes on the right side, and then move the upper screws downwards.
6. Remove all the second vertical screws on the left and remove the red iron sheet.
7. Then remove the first vertical row of screws on the right side
8. Remove all vertical screws in order
9. Then remove the horizontal iron sheet of the fourth row
10. Then remove all the screws on the largest piece of iron sheet
11. Finally, remove all the screws in order to pass the level.
1. The first step is to move the screw on the right to the top and clean the strip in the lower right corner.
2. Then move the screws below to clear the bottom.
3. Then starting from the right, clean the strips on the gasket step by step.
4. Let the washer drop to the bottom, and gradually remove the screws supporting the washer, and the washer can fall down.