Here I will show you how to lay circuits in City Skylines 2. This is a game that many friends are playing recently. This is also a problem that many players encounter. For those who don’t know how to do it, please come and take a look at the detailed strategy.
Answer : Ordinary low-voltage circuits are laid automatically following the road, while high-voltage circuits need to be laid independently.
1. First of all, after we complete the prototype of a city, we can choose the location of the power station. This must be a location connected to roads.
2. Power stations and substations need to be connected to each other, and all wires can be buried underground, which can save space.
3. The laying of high-voltage circuits mainly takes into account areas with large electricity consumers, and needs to be planned in advance to save distance.