The following is the construction guide of the dam hydropower station in the game "City Skylines 2". As the player further develops, in the game "City Skylines 2", the problem of insufficient water and electricity supply is encountered when building the dam hydropower station. The pollution index and power generation capacity of dam hydropower stations are very high, so there are some skills that need to be paid attention to when building dam hydropower stations. Interested players can take a look together, I hope it will be helpful to you.
"Cities Skylines 2" dam hydropower station construction guide
1. The top must be shallow enough that water can enter the two generator sets, but do not overflow.
2. Dig the deepest hole below
3. Let the water be connected first before digging a hole. If you dig a hole first, the flow will be cut off.
4. After generating electricity, save and then read the file, the data will be normal.
Shuiyuan has built two hydropower stations in Twin Mountains, both of which are fully loaded.